Cabin of the apprêts
11 September 2026Renault
Modernization of the aeraulic installations in the cabin of the apprêts in Douai
As part of the Perceived Quality convergence, EPI intervened on the Renault industrial site in Douai for the modernization of the air handling installations of the primers cabin.
The work carried out
In addition, the EPI teams carried out several interventions on the installations of the primers’ cabin.
- Replacement of 4 extraction hoses in the finishing cabin;
- Installation of an aeraulic silhouette / cantonment band in the cabin;
- Implementation of a flow control on the two air conditioners of the primers;
- Replacement of the engines in conditioners SS2 and SS3;
- Airflow adjustment of the cabin;
- Installation of door sensors in groups SS2 and SS3.
The expertise mobilized
This project mobilized EPI’s expertise in the fields of aeraulics, mechanics and automation. Throughout this project, EPI supported Renault from the design phase to the commissioning of the installations.
A project in collaboration with our partners
EPI also carried out this project in collaboration with several partners. The team thanks TSC and OTHUA for their contribution to the project.
A project now completed
The work carried out on the Renault industrial site in Douai is now complete. EPI thanks Renault for this collaboration and for the renewed trust throughout the project.
Congratulations to all the teams mobilized for their commitment and expertise throughout the project.
Cabin of the apprêts